- Within our experience we can mention :
Foundation whitening tower December 2017 - February 2018 for Unibol Bag Factory In (Barranquilla) . - Grouting and Concrete filling under the rails of the slip tracks and construction of a rudder maneuvering log for Naviera Fluvial Colombiana S.A September 2017 (Barranquilla).
- Repair of the Dow path for Trujillo Serranos Ingenieros Ltda. August 2017 in (Barranquilla).
- Installation of Floors, Supply and installation of Ceiling, Installation of Facade Final Assembly of Walls in the Shopping Center Nuestro Atlantico Local of Claro June 2017 in (Barranquilla).
- Repair of lanes # 2,3 and 4 of the Slip and the stabilization of terrain between lanes for Naviera Fluvial Colombiana S.A April 2017 in Barranquilla).
- Ground and sub-base movement and Asphalt Concrete construction Hangar Air Base Santa Martha, Jun to Oct/2002.
- Construction of buildin in the new branch, office and camp MEC S in C in Barranquilla. Office área 344,25 M2 and warehouse 297,21 M2.
- Bridge rehabilitation “los Coquitos Palomino” (with retaining walls in gabions 580 M3 and geo-muros 78 M3
- Paving of main roads San Juan del Cesar and Molino (GUAJIRA) (21.000 m2 de concreto).
- Construction Headquarters offices in Sierra Suarez 1.550 m2 (Barranquilla)
- Sanitary sewer and paving for road network in Albania (GUAJIRA)
- Medical unit Construction (UNIS) in pipeline Ecopetrol (COVEÑAS, SUCRE)
- Construction of 10.000m2 of rigid pavement and 7.000m2 of concrete lining of the Leon Stream. Urbanization Caribe Verde (BARRANQUILLA).
- Technical construction supervision 36.209,58 M2 of pavements for mayor Albania Guajira.